NOW OPEN Supervisor elect Tony Nuñez enjoys his first ride down a huge slide with his son and hundreds of others on the official reopening of the renovated Ramsay Park Sunday. (Tarmo Hannula/The Pajaronian)

Hundreds of children gathered at the precipice of the new playground at Ramsay Park on Sunday afternoon, waiting to be let in for the first time.

The kids were uninterested in the ceremonial ribbon-cutting ceremony that officially opened the new facility, or in the speeches that preceded it.

Instead, they chanted “Cut it! Cut it!” as they prepared to dash in and climb, spin, swing and slide on the new equipment.

IN THE SWING New pieces of playground equipment filled with people during the opening ceremony. (Tarmo Hannula/The Pajaronian)

The Nov. 22 celebration marked the completion of a $34 million renovation of Watsonville’s largest park, a project that transformed the 26-acre facility with new athletic fields, a dog park, improved lighting and what city officials say is the largest inclusive playground in Santa Cruz County.

For 12-year-old Aleyda Ortega Lopez, who attends Aptos Junior High School, the new playground stood out from others she has visited.

“It’s very unique,” she said. “It’s very big, and a lot of kids like it.”

SWINGING These kids enjoy one of the playground’s features. (Todd Guild/The Pajaronian)

Ramiro Valle-Sanchez, who attended with his wife and 5-year-old twins, said the improvements were long overdue.

“I think it lifts everybody’s spirits because they’ve been waiting for this for a very, very long time,” he said.

He was particularly impressed by the renovated athletic fields.

“I saw the field and I was amazed how the greenery brought it to life,” he said.

The project includes the renovated Sotomayor Soccer Field, with natural turf, irrigation, terraced seating and lighting, and the Gulermovich Multi-Use Field, which replaces a former softball field with synthetic turf designed for soccer and softball.

Other improvements include a dog park with separate areas for large and small dogs, accessible pathways, picnic areas and 12 mosaic medallions depicting local wildlife and the region’s natural environment.

City Manager Tamara Vides called the renovation a once-in-a-lifetime project that required years of planning and assembling funding from multiple sources.

“It’s a lifetime project,” she said. It took a lot of effort and many years.”

Funding included Watsonville’s voter-approved Measure R, $7 million in state funding secured with the help of Assembly Speaker Robert Rivas and federal American Rescue Plan funds.

Rivas said the improvements reflect the recreational opportunities Watsonville families have long sought.

“Families here wanted soccer fields so their kids could use year round,” he said. “They wanted a playground where children of all abilities could play together and today at this space they have both.”

Rep. Zoe Lofgren and state Sen. John Laird also attended the ceremony.

Laird noted that the park, which first opened in 1973, was built for a different Watsonville.

“What this project does is this brings the park in line with what the needs are now in Watsonville,” he said.

Among the speakers was Brenda Gutierrez Baeza, a Watsonville resident who uses a wheelchair.

“Growing up in Watsonville I didn’t have an inclusive playground where I could play with my friends,” she said. “Something I always wished was possible.”

She said the new playground offers children with disabilities an opportunity to participate alongside their peers, while allowing parents and grandparents with disabilities to join in.

“Today children with and without disabilities will have a place where they can play together and build friendships,” she said. “A place where having a disability doesn’t mean being left on the sidelines.”

The celebration also recognized a mural depicting community members with disabilities, part of an effort to make the park more welcoming.

Robert Locke-Paddon, great-grandson of the park’s namesake, Will “Doc” Ramsay, spoke about his ancestor’s nearly 33 years of service in Watsonville city government.

Ramsay arrived in Watsonville in 1908, established a veterinary practice and later served as an alderman and two-term mayor.

Locke-Paddon helped dedicate a plaque honoring his great-grandfather.

Watsonville Mayor Kristal Salcido said the improvements represent an investment that will benefit residents for generations.

“This investment represents more than improvements to park facilities—it is an investment in the health, connection, and well-being of our community for generations to come,” she said.

Previous articlePajaro Valley High students honor Ruby Bridges with walk to school
Managing News Editor, with The Pajaronian since 2007. I cover nearly every beat. I specialize in feature stories, but equally skilled in hard and spot news. Pajaronian/Good Times/Press Banner reporter.

LEAVE A REPLY

Please enter your comment!
Please enter your name here